The Tosno plant of prefabricated reinforced concrete structures "Stroydetal" was built in 1957 according to the project of "Lengiprotrans" on the basis of a construction yard. The production...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Podporozhsky Plant of Reinforced Concrete Bridge Structures (MZhBK) is an enterprise specializing in the production of reinforced concrete bridge spans and centrifuged shell piles. It was...
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. One of such objects, the bridge crossing at the dam of the Kaunas HPP hydroelectric power...
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. The design of a road bridge across the Narva River solved the transport problems of Narva and...
The railway line Pavlovsk - Vyritsa - Poselok is a section of the Vitebsk line of the Oktyabrskaya railway.
The project for the electrification of the Leningrad-Pavlovsk section was developed...
The Bologoye - Riga railway line is the main direction of the meridional route associated with the delivery of goods to the seaport of the city of Riga.
In the period 1951-1955, Lengiprotrans...
Pages