Design and survey work on the construction of the new railway bridge began immediately after the collapse of the span of the old structure on June 1, 2020, under the influence of the abundant...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In December 2020, JSC Lengiprotrans completed the development of pre-design documentation for the Shongui Yard.
The basis for the deployment of the design work was the instruction of the...
In 2020, at a meeting between the Governor of the Kostroma Region and the General Director of Russian Railways, an agreement was reached on the technical re-equipment of the Kostroma station...
According to the results of the competition of theConstruction Committee, won in 2016, Lengiprotrans completed design work for the construction of a stationary institution of social services "...
The construction of the Baikal-Amur Mainline (BAM) can rightfully be called a significant achievement of transport construction at the end of the 20th century. The specialists of Lengiprotrans...
Mogocha is a station in the Chita region of the Trans-Baikal Territory. It is located on the Trans-Baikal Railway, which is part of the Trans-Siberian Railway.
The object is located in the...
Pages