The Bologoye - Riga railway line is the main direction of the meridional route associated with the delivery of goods to the seaport of the city of Riga.
In the period 1951-1955, Lengiprotrans...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1950s, Lengiprotrans developed a project for a new passenger station in Karaganda. This was due to the development of virgin fallow lands of the Kazakh SSR and the development of the coal...
In 1950-1960s Lengiprotrans developed a project for the reconstruction of a railway station in Riga. This was the first renovation of the building since its construction at the end of the 19th...
The railway line Leningrad - Zelenogorsk - Roshchino - Vyborg is the main section of the Vyborg direction of the Oktyabrskaya railway.
In the 1950s – 1960s, Lengiprotrans participated in the...
In 1960-1970, Lengiprotrans developed a project for the reconstruction of the railway station in the city of Saratov, built in 1871.
According to the project, it was planned to cut off a part...
The Bui depot is located at the station of the same name on the Northern Railway. It was formed as a locomotive depot in 1905.
In the 1960s, Lengiprotrans developed a project for the...
Pages










