Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
Комсомольский завод сборных железобетонных конструкций
In 1954, the Lengiprotrans Plants Department developed a project for a precast concrete plant in Komsomolsk-on-Amur. Although the department was engaged in work on a plant of this profile for...
  • 1950 — 1959
  • 1960 — 1969
Станция стыкования постоянного и переменного токов Балезино
Balezino is a station on the Kirov - Perm line of the Gorkovskaya railway. It is one of the key traction current docking stations on the Russian railway network, serving both passenger and freight...
  • 1970 — 1979
Оборудование автоблокировкой участка Ручьи — Парголово
Ruchyi - Pargolovo - a section of the St. Petersburg - Vyborg direction of the Oktyabrskaya railway. In the 1970s, according to the Lengiprotrans project, the Leningrad-Sortirovochny-Moskovsky...
  • 1990 — 1999
Цех технического обслуживания пассажирских вагонов на станции Калининград
In the 1990s, Lengiprotrans developed a project for a workshop for the maintenance of passenger cars at the Kaliningrad station. A building with utilities was designed for technical inspection of...