In 2013, Lengiprotrans developed a project for the modernization of charging devices and testing brakes in the passenger and receiving and departure depot of the Shkirotava station of the Latvian...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
ТЧ-6 "Kryukovo" - a multi-unit depot at the Kryukovo station of the Oktyabrskaya Railway (OZhD). In the 1990s, Lengiprotrans developed a project for a depot, including a workshop for washing...
Since the 1960s, Lengiprotrans has been actively involved in the development of the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Tartus and Latakia...
The Leningrad City Electric Transport Repair Plant was founded in 1934 on Chugunnaya Street. The enterprise was intended for the production of rolling stock for the tramway system of Leningrad...
In the early 1980s, Lengiprotrans developed a project for a wheel-and-bogie workshop for a refrigerator depot at Valga station of the Estonian Railways.
Heating networks and ventilation were...
Tselinograd (now Astana) is a railway station of the Kazakhstan Railways in the capital of Kazakhstan, the city of Astana.
In the 1980s, the Lengiprotrans Department of Plants (now part of the...