In 1950-1960s Lengiprotrans developed a project for an overpass with Endla Street in Tallinn. The work was carried out as part of the reconstruction of the Tallinn railway junction.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950-1960s Lengiprotrans designed the Kyzyl - Mazhalyk (Aktovrak) - Abaza highway. The road has republican significance and passes through the territory of Khakassia and Tuva.
The...
The Ivdel - Ob railway line (now the Ob region) is the final section of the Sverdlovsk railway. It was intended for the export of wood from large tracts of the Sverdlovsk and Tyumen regions to the...
Railway line Majori - Dubulti - section of the electrified line Tornakalns - Tukums II of the Latvian Railways. It passes through the territory of the Riga seaside in the city of Jurmala....
Kartaly — Tobol is a railway section providing transport links between Russia and Kazakhstan.
Automatic blocking on the line was designed by Lengiprotrans in 1958 during the development of...
In 1950-1970s one of the main directions of the Department of Plants (now as part of the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans was the design of...
Pages