Since its inception, Lentransproekt (since 1951 - Lengiprotrans) has been involved in the transport development of the Kazakh SSR. In the 1950s, the Kostanay (now Kostanay) - Tobol - Dzhetygara (...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Irtyshskoe - Karasuk railway line is the eastern section of the Central Siberian Railway. It was built according to the Lengiprotrans project in the late 1950s.
At the same time, a railway...
The Esil - Lomonosovskaya - Uritskoye railway line is a narrow-gauge railway that played a significant role in the first period of the development of the virgin lands of Kazakhstan.
The project...
Overyatskiy Plant of Reinforced Concrete Structures is an enterprise specializing in the production of reinforced concrete structures (RC) for industrial and civil construction. It was built in...
The Tosno plant of prefabricated reinforced concrete structures "Stroydetal" was built in 1957 according to the project of "Lengiprotrans" on the basis of a construction yard. The production...
The Podporozhsky Plant of Reinforced Concrete Bridge Structures (MZhBK) is an enterprise specializing in the production of reinforced concrete bridge spans and centrifuged shell piles. It was...