In the 1950s – 1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950-1980s Lengiprotrans developed a project for a washing and steaming station in the village of Vederniki, Smolensk Region. This complex was intended for washing and steaming railway tank...
Carrying out a complex of engineering surveys requires a large number of equipment and vehicles. In this regard, in 1950-1960, specialists from the Architectural and Construction Department...
Karaganda is a railway station in the Karaganda region of Kazakhstan. Coal mining is carried out in the region, enterprises of mechanical engineering, metalworking and food industry operate.
In...
The Kirishi washing and steaming station (PPS) is a structural subdivision of the St. Petersburg branch of the Oktyabrskaya railway. The project of the complex was developed by the Department of...
The railway line Kozhva - Vorkuta is a section of the North Pechora railway (since 1959 as part of the Northern Railway). The main line was built according to the project of Lentransproekt (...
Pages