In the 1960s, Lengiprotrans developed a project for the development of the Riga-Passenger station of the Baltic railway.
At the station, the following were designed: a track section with...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
From the very foundation Lengiprotrans took an active part in the transport development of the Kazakh SSR. In 1954, a large-scale development of virgin and fallow lands began in the republic and a...
By order of the Ministry of Transport Construction of the USSR, Lengiprotrans designed the Chudovsky Reinforced Concrete Sleepers Plant (RCS). In the 1960-1970s, due to the growth of cargo...
From the beginning of its activity Lengiprotrans took an active part in the transport development of the Kazakh SSR. In the 1950s - 1960s, the institute created a project for a new railway line...
The Podporozhsky Plant of Reinforced Concrete Bridge Structures (MZhBK) is an enterprise specializing in the production of reinforced concrete bridge spans and centrifuged shell piles. It was...
On September 20, 1954, the Council of Ministers of the USSR adopted Resolution No. 1985 “On the construction of narrow-gauge railway lines in the areas of virgin and fallow lands development”. The...
Pages








