In the 1960s – 1970s, Lengiprotrans prepared projects for highways in the Leningrad Region by order of the USSR Ministry of Agriculture.
A major overhaul of the existing roads was planned with...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Sosnogorsk - Troitsko-Pechorsk railway line is a section of the Northern Railway passing through the territory of the Komi Republic.
The project of the Sosnogorsk - Troitsko-Pechorsk line...
In the 1960s, Lengiprotrans participated in the design of buildings and structures on the Latakia - Oronte and Kamyshli - Aleppo - Oronte railways under construction in the Syrian Arab Republic....
During the Soviet period Lengiprotrans designed a number of railway post offices. One of the first was Rizhsky, whose successful design solution was noted by the Ministry of Communications and the...
The Tallinn-Baltic railway station was built in 1870 as the main station on the Baltic Port - Revel - St. Petersburg railway. During the Second World War, the building was badly damaged. In the...
In the first half of the 1960s, Lengiprotrans participated in the development of projects for buildings and structures on the Latakia - Oronte and Kamyshli - Aleppo - Oronte railways under...
Pages


































