In the early 1980s, Lengiprotrans developed a project for a wheel-and-bogie workshop for a refrigerator depot at Valga station of the Estonian Railways.
Heating networks and ventilation were...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Kokchetav (now Kokshetau) is the administrative center of the Akmola region of Kazakhstan.
In the 1980s, according to the Lengiprotrans project, the City Vocational School for 480 students was...
In the 1980s Lengiprotrans was involved in solving transport problems in the Komi Republic. Design of a road bridge under the direction of A.P. Petrova contributed to the solution of transport...
Lengiprotrans has done a lot of work on the reconstruction of the carriage facilities and, first of all, car repair depots (WRD). Among other objects, the WFD was designed at the Ekibastuz II...
During the Soviet period, Lengiprotrans took an active part in the development of transport infrastructure in the Baltic countries. A large number of artificial structures were designed, in...
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya — Bovanenkovo railway line. In particular, a locomotive depot was designed at the Obskaya station...
Pages








