Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
Railway overpass on the section Vilnius — New Vilnia
In the 1980s, Lengiprotrans engineers designed various objects in the Baltics. Thus, by order of the Baltic Railway, Lengiprotrans has developed a project for a railway overpass on the Vilnius —...
  • 1980 — 1989
Промывочно-пропарочная станция Мажейкяйского нефтеперегонного завода
In the 1980s, Lengiprotrans prepared a design for a washing and steaming station for servicing the Mazeikiai oil refinery at the Bugeniai station of the Lithuanian railway. At the facility, the...
  • 1980 — 1989
Производственная база треста «Мостострой-6»
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya - Bovanenkovo railway line. In particular, the production base of the Mostostroy-6 trust was designed....
  • 1980 — 1989
Вагоноколесные мастерские на станции Целиноград Целинной железной дороги
Lengiprotrans has worked on the design of many facilities in Kazakhstan. One such facility, the carriage wheel shops at Tselinograd station, was designed in the early 1980s with the aim of...
  • 1980 — 1989
Пункт подготовки вагонов под погрузку на станции Экибастуз-II
Lengiprotrans is the author of many railway projects in Kazakhstan. So, in the first half of the 1980s, engineers developed a project for the preparation of wagons for loading at the Ekibastuz-II...
  • 1980 — 1989
Вагоноремонтное депо на станции Экибастуз II
Lengiprotrans has done a lot of work on the reconstruction of the carriage facilities and, first of all, car repair depots (WRD). Among other objects, the WFD was designed at the Ekibastuz II...
Pages