In the 1980s, Lengiprotrans engineers worked on a project to reconstruct a road bridge across the supply canal on the road to the Estonian State District Power Plant. This project was carried out...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, Lengiprotrans developed a project for a road overpass at the intersection of Oktyabrsky Prospekt with Võidujoksu Street in the Dvigatel microdistrict of the Lasnamäe residential area...
In the 1980s, Lengiprotrans engineers designed various projects in the Baltics. One of them was the overpass at the intersection of the road to the Pribaltiyskaya GRES with the railways of the...
Port of Klaipeda is the northernmost ice-free port on the Eastern coast of the Baltic Sea and was a major transport center of the Lithuanian SSR. In the USSR, the exchange of goods with the...
Port of Klaipeda is the northernmost ice-free port on the Eastern coast of the Baltic Sea in Lithuania. It was a major transport center in the Soviet Union.
In the USSR, the exchange of goods...
Klaipeda Port is the northernmost ice-free port on the Eastern coast of the Baltic Sea in Lithuania. In the 1980s, Lengiprotrans developed a ferry crossing in the port, which significantly...
Pages