The Ülemiste - Maardu railway line is a connecting section of the Ülemiste - Muuga railway in Estonia.
In the 1980s, Lengiprotrans was engaged in the reconstruction of the site to create...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. In the 1980s, the institute developed a project for the Tartus-Latakia line for operational...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect seaports with the eastern regions of the country for the export of...
In the early 1980s, Lengiprotrans developed a project for a wheel-and-bogie workshop for a refrigerator depot at Valga station of the Estonian Railways.
Heating networks and ventilation were...
Kokchetav (now Kokshetau) is the administrative center of the Akmola region of Kazakhstan.
In the 1980s, according to the Lengiprotrans project, the City Vocational School for 480 students was...
In the 1980s Lengiprotrans was involved in solving transport problems in the Komi Republic. Design of a road bridge under the direction of A.P. Petrova contributed to the solution of transport...
Pages


































