In the 1960s, Lengiprotrans developed a project for the reconstruction of the production base of the construction department No. 312 of the Balttranstroy trust in Kaliningrad.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea.
The...
In the 1970s, Lengiprotrans took part in the development of the external transport system of the Kostomuksha Mining and Processing Plant (GOK). As part of this, the Kostomuksha highway - the state...
In the 1970s, the Department of Hubs and Stations of Lengiprotrans developed a significant number of copyright objects for the development of railway junctions and marshalling yards. Among them, a...
The Ulyanka passenger stop is located on the 12th km of the Baltic line of the Oktyabrskaya railway. The directions St. Petersburg - Kalische and St. Petersburg - Gatchina-Baltiyskaya pass through...
In 1954, the Lengiprotrans Plants Department developed a project for a precast concrete plant in Komsomolsk-on-Amur.
Although the department was engaged in work on a plant of this profile for...