Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
  • 2000 — 2009
Автодорожный мост через реку Надым вдоль трассы Трансполярной магистрали
Engineers of Lengiprotrans have extensive experience in the design of transport facilities in the Far North. In the second half of the 1990s, during the construction of a road, the Institute's...
  • 1990 — 1999
  • 2000 — 2009
Моторвагонное депо «Крюково»
ТЧ-6 "Kryukovo" - a multi-unit depot at the Kryukovo station of the Oktyabrskaya Railway (OZhD). In the 1990s, Lengiprotrans developed a project for a depot, including a workshop for washing...
  • 1990 — 1999
Электрификация участка Идель — Беломорск
In the 1990s, the electrification of railway tracks in the North-West of Russia was widely developed, in which Lengiprotrans took an active part. As part of this work, the Idel - Belomorsk section...
  • 1990 — 1999
Электрификация железнодорожного участка Волховстрой — Тихвин — Кошта
In the 1990s, Lengiprotrans developed a project for the electrification of the Volkhovstroy - Tikhvin - Koshta section in connection with the transfer of freight traffic to it. This was supposed...
  • 1990 — 1999
Электрификация участка Волховстрой — Свирь
In the 1990s, the electrification of railway tracks in the North-West of Russia was widely developed, in which Lengiprotrans took an active part. The work began with the design of the Volkhovstroy...
  • 1990 — 1999
Второй главный путь на участке Шиповка — Пост 26 км
In the 1990s, Lengiprotrans developed a project for the second main track on the Shipovka - Post section of 26 km in the Kaliningrad railway. In the course of engineering surveys, mine workings...
Pages