In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) participated in the development of projects for both the capital restoration of units and stations destroyed during the Great...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Kohtla-Järve and Ahtme gas shale plants are located in the northeastern part of Estonia.
The decision to build a new oil shale processing complex in Kohtla-Järve was made by the USSR State...
The Vologda — Cherepovets railway line — a section of the Northern Railway, was put into operation as part of the Obukhovo — Vologda line in 1905.
The project of the second tracks on...
Railway line Perm - Balezino - section of the Kirov - Perm line of the Gorkovskaya railway.
The line was electrified according to the Lengiprotrans project in 1951-1959. On the tracks, a coded...
In the 1940s – 1950s, Lengiprotrans designed a new capital bridge across the Vilia (also Neris) river at 31 km of the Vilnius-Turmantas railway section of the Lithuanian railway. Working drawings...
Kartaly is a large railway junction in the Chelyabinsk region. It is located near the border with Kazakhstan, and there is also a railway border checkpoint. The railway junction has connections to...
Pages