Engineers of Lentransproekt (since 1951 - Lengiprotrans) have worked on various transport facilities in Karelia. In the post-war period, the institute designed a single-track railway line...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Pääsküla-Keila railway line is a section of the Tallinn-Keila railway in Estonia.
In November 1945, the Department of Electrification and Power Supply was formed at Lentransproekt (since...
Kurgan — Atbasar is a meridional railway project developed by Lengiprotrans for the development of virgin lands and transportation of grain crops.
Hydrological and hydrogeological surveys of...
Railway line Kostroma - Galich - a section of the Northern Railway. The idea of its creation arose back in the 19th century. The plan was started immediately after the end of the Great Patriotic...
The Tallinn - Pääsküla railway line is a section of the Tallinn - Keila railway in Estonia.
In November 1945, the Department of Electrification and Power Supply was formed at Lentransproekt (...
Kostanay (now Kostanay) - Kokchetav (now Kokshetau) is a section of the Central Siberian railway in Kazakhstan. The line was designed by Lengiprotrans in the 1950s – 1970s for the development of...
Pages