In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) continued to work in Kazakhstan. In 1948-1955, the electrical interlocking of forty-nine turnouts was developed at the Bolshaya...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. So, by the mid-1950s, a project was developed for plumbing workshops in Akmolinsk (since 2019 -...
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. In the post-war years, according to his project, production facilities were built for...
The Mikun - Syktyvkar railway line is a dead-end branch of the Northern Railway. In the late 1950s, the USSR government decided to build it. The project of the line was developed by the...
The Pechora railway station is located at the station of the Northern Railway. The settlement here was formed as a result of the construction of the North-Pechora railway, intended for the export...
In the post-war years, the Lentransproekt architectural studio (since 1951 - Lengiprotrans) developed a project for the restoration of the railway station at Abrene station (now Pytalovo station...
Pages

































