In the 1960s, Lengiprotrans developed a project for the reconstruction of the railway station at Klaipeda station in Lithuania.
Photo: Railway station at Klaipeda station (source: ...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Astrakhan railway station is part of the Volga railway. The station building was built at the beginning of the 20th century. In the 1960s, in order to service the increased passenger traffic,...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Latakia and Tartus with the eastern regions of the...
In the 1960s, Lengiprotrans developed a project for the development of the external railway transport of the Klaipeda oil depot in connection with its expansion.
At the site, the following were...
In 1950-1960s Lengiprotrans designed a bridge over the Abakan River as part of the construction of the Kyzyl - Mazhalyk (Aktovrak) - Abaza highway. The construction of the route made it possible...
During the construction of railways for the development of virgin lands in Kazakhstan Lengiprotrans developed a project for the state farm "Tselinogradsky" 25 km from Tselinograd (now Astana...
Pages


































