In the 1960s, Lengiprotrans developed a project for the reconstruction of the railway station at Klaipeda station in Lithuania.
Photo: Railway station at Klaipeda station (source: ...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Astrakhan railway station is part of the Volga railway. The station building was built at the beginning of the 20th century. In the 1960s, in order to service the increased passenger traffic,...
In the 1960s Lengiprotrans developed a project for the development of the Radviliskis station of the Baltic railway.
The object was designed:
• track section and subgrade;
• water supply and...
In the 1960s, Lengiprotrans developed a project for the development of the external railway transport of the Klaipeda oil depot in connection with its expansion.
At the site, the following were...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Latakia and Tartus with the eastern regions of the...
In the 1960s, Lengiprotrans participated in the design of buildings and structures on the Latakia - Oronte and Kamyshli - Aleppo - Oronte railways under construction in the Syrian Arab Republic....