Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 2000 — 2009
Путепровод в створе Александровской Фермы
In the 2000s, Lengiprotrans specialists developed a project for an overpass along Aleksandrovskaya Fermy Avenue through the tracks of the Oktyabrskaya Railway. The old overpass on this site was...
  • 2000 — 2009
Реконструкция магистрали на участке от перекрестка проспекта Красного Знамени и улицы Некрасовской до стадиона «Строитель» во Владивостоке
In the 2000s, Lengiprotrans developed a project for the reconstruction of a city-wide highway of continuous traffic on the section from the intersection of Krasniy Znameni Avenue and Nekrasovskaya...
  • 2000 — 2009
Вторые пути на участке Буй — Вологда
The Bui - Vologda railway line is part of the Northern Railway. In the early 2000s, Lengiprotrans developed a project for second tracks on the site in order to increase the throughput of the East-...
  • 2000 — 2009
Реконструкция линии Санкт-Петербург — Бусловская
At the turn of the 20th – 21st centuries, Russia began to actively introduce high-speed traffic into the railway network. Lengiprotrans has developed a project for organizing high-speed passenger...
  • 2000 — 2009
Реконструкция транспортной зоны на территории Государственного комплекса «Дворец конгрессов»
In 2002-2003, on the eve of the celebration of the 300th anniversary of St. Petersburg, Lengiprotrans performed large and important work on the design of buildings and structures in the western...
  • 2000 — 2009
Проектирование станции Лужская-Нефтяная
Development of technical solutions for servicing the liquid cargo complex and passing the transit flow in the direction of Luzhskaya-General station and for the further development of the...
Pages