For many years, Lengiprotrans has been designing the Virgin Railway, which runs through the territory of Northern and Central Kazakhstan. This was due to the development of virgin fallow lands...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1970s, Lengiprotrans engineers designed a base for the repair of metro cars in Kiev. The facility was created with the aim of organizing all types of metro car repairs in order to return...
The Kokchetav (Kokshetau) - Kzyl-Tu railway line is a section of the Kazakhstan railway. The project of the second tracks on the site was developed by Lengiprotrans by decree of the Central...
During the Soviet period, Lengiprotrans took an active part in the transport development of railway approaches and stations at the seaports in the Baltic States. For the development of the...
In the 1970s – 1980s, Lengiprotrans developed a project for second tracks with electrification on the Kokchetav (now Kokshetau) - Tselinnye Sands - Presnogorkovskaya section by decree of the CPSU...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
The Institute took part...
Pages










