Bata - Karabas is a section of the Kazakhstan railway.
In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 5 railway line stations with 21 turnouts...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, Lengiprotrans developed a project for a road overpass on the 366th km of the Pskov - Pytalovo railway section of the Oktyabrskaya railway.
In 1980-1990, Lengiprotrans developed a project for a boarding house on the shores of the Tsemesskaya Bay of the Black Sea in the village of Kabardinka, 15 km from Gelendzhik. The institution was...
Tobol - Dzhetygara is a section of the Kostanay - Dzhetygara railway line of the Kazakhstan railway. The line was designed by Lengiprotrans in the 1950s to transport iron ores from the Sokolovo-...
In the 1980s, Lengiprotrans developed projects for 3 bridge crossings over the Nyukzha River on the highway along the Baikal-Amur Mainline:
• at 286 km of the road;
• at 307 km in the area of ...
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Strugi Krasnye Oktyabrskaya railway station.
Pages