Engineers of Lengiprotrans worked on various projects in the Baltics, including road projects. Thus, the automobile overpass at the intersection of the Southern Bypass with the railway access...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Strugi Krasnye Oktyabrskaya railway station.
Riga-Passenger is the main railway station in the capital of Latvia.
In the 1980s, Lengiprotrans developed a project for the modernization of electrical interlocking devices (EC) for 130...
Since the 1960s, Lengiprotrans has been actively involved in the development of the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Tartus and Latakia...
Tornakalns - a railway station in the Tornakalns microdistrict of the Zemgale suburb of Riga. The railway lines Tornakalns - Tukums II and Riga - Jelgava pass through it.
In the 1980s,...
In the 1980s, Lengiprotrans developed a project for the production base for the construction and assembly train 675 of the Sevzaptransstroy trust in Tallinn.
At the facility, the following were...
Pages


































