In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for a station at the Kokchetav (now Kokshetau) station of the Karaganda railway. The exterior and interior...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Kirovsk-Afrikanda highway passes through the territory of the Murmansk region. The project of the road was developed by the specialists of Lengiprotrans in the 1970s.
In the 1980s, in the course of the development of the railway network of the Kazakh SSR, Lengiprotrans developed a project for the plant of reinforced concrete structures of the...
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea.
The...
The Tosno - Malaya Vishera - Bologoye - Likhoslavl - Klin railway line is part of the Oktyabrskaya Railway.
The project for the electrification of the line was developed by Lengiprotrans in the...
Railway line Kostanay (now Kostanay) - Uritskoye - a section of the railway Kostanay - Kokchetav (now Kokshetau), designed by Lengiprotrans for the development of virgin lands in the Kazakh SSR...