In the 1950s, Lengiprotrans carried out design and survey work to strengthen the sick embankment at 107 km of the Siauliai - Klaipeda line in the Lithuanian railway.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the late 1990s, according to the Lengiprotrans project, a base for the repair of escalators of the Petersburg Metro was built in the Rybatskoye industrial zone. Earlier, in the 1950s, the...
In the 1950s, Lengiprotrans developed a project for the overhaul of the bridge over the Pissa River at 912 km of the Virbalis - Kaliningrad section of the Lithuanian Railway.
In 1989, Lengiprotrans prepared a project for the reconstruction of a contact network on the Buslova - State Border stretch in the area of the state border with Finland.
Petrolesport is a container terminal on Volny Island in the seaport Big Port of St. Petersburg.
Lengiprotrans has developed a railway transport project for the Petrolesport terminal with the...
St. Petersburg-Sortirovochny-Moskovsky is a large marshalling yard of the Oktyabrskaya railway, stretching in the southeast of the city from the central part and further beyond the Ring Road. It...
Pages