The Vologda railway junction is part of the Northern Railway and is one of the largest in the North-West of Russia. The density of public railways is 53 km per 10 thousand square meters. km with...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Solvychegodsk diesel locomotive depot is a depot at the station of the same name on the Northern Railway (SZD). It was organized in 1942 as a car repair site. In the postwar years,...
In 1950-1980, Lengiprotrans developed a project for a washing and steaming station Promyshlennaya in the Kemerovo region. This complex was intended for steaming and washing railway tanks and...
The Nyandoma diesel locomotive depot is located on the Konosha - Arkhangelsk line, which is part of the Northern Railway (SZD). At present, it is divided into the operational locomotive depot TChE...
The Bui depot is located at the station of the same name on the Northern Railway. It was formed as a locomotive depot in 1905.
In the 1960s, Lengiprotrans developed a project for the...
In 1960-1970, Lengiprotrans developed a project for the reconstruction of the railway station in the city of Saratov, built in 1871.
According to the project, it was planned to cut off a part...
Pages
































