The Tashkent-Samarkand railway line is the second high-speed line in the CIS after the Moscow-St. Petersburg line. The line connects the 2 largest cities of Uzbekistan.
As part of the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Pääsküla is a railway station on the Keila - Tallinn line of the Estonian Railways.
In 2010 Lengiprotrans took part in design work for the reconstruction of a traffic intersection at Pääsküla...
The Losevo - Kamennogorsk railway line is a section of the Oktyabrskaya railway in the direction of Ruchyi-Petyayarvi - Kamennogorsk - Vyborg. Lengiprotrans has developed a project for the...
Small (Children's) October Railway (MOZhD) is designed to educate and train schoolchildren and students for railway professions.
The first MOZhD in Leningrad was opened in 1948. It was 8.1 km...
Ülemiste is a stopping point in Tallinn on the Tallinn-Tartu and Tallinn-Narva railway lines.
In 2009–2010, Lengiprotrans took part in design work for the reconstruction of the Ülemiste railway...
Volkhovstroyevsky railway junction is a large junction of the October railway. The railway junction includes: Porogi station, Kukol station, post 2 km, post 12 km, post 117 km and other stations...
Pages