In the 1980s, Lengiprotrans developed projects for 3 bridge crossings over the Nyukzha River on the highway along the Baikal-Amur Mainline:
• at 286 km of the road;
• at 307 km in the area of ...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Riga-Passenger is the main railway station in the capital of Latvia.
In the 1980s, Lengiprotrans developed a project for the modernization of electrical interlocking devices (EC) for 130...
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Strugi Krasnye Oktyabrskaya railway station.
Tornakalns - a railway station in the Tornakalns microdistrict of the Zemgale suburb of Riga. The railway lines Tornakalns - Tukums II and Riga - Jelgava pass through it.
In the 1980s,...
Railway line Belomorsk - Sumskiy Posad - section of the Oktyabrskaya railway. The line runs along the coast of the Onega Bay in the north-east of the Republic of Karelia.
The line was...
In the 1980s, Lengiprotrans engineers designed various projects in the Baltics. Thus, by order of the Baltic Railway, Lengiprotrans has developed a project for a railway overpass in the town of...