Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
  • 1990 — 1999
ЭЦ на станции Ницгале
Nitsgale is a railway station on the Krustpils - Daugavpils line in the Daugavpils region of Latvia. In the 1980s, Lengiprotrans developed a project for electrical interlocking (EC) for a 31-...
  • 1980 — 1989
Путепровод на пересечении Южного объезда с железнодорожными путем перегона Вильнюс — Киртимай
In the 1980s, Lengiprotrans developed a project for the construction of an overpass in Vilnius at the intersection of the Southern Bypass with the Vilnius-Kirtimai railway line.
  • 1980 — 1989
Путепровод на пересечении Южного объезда с подъездным железнодорожным путем
In the 1980s, Lengiprotrans developed a project for an overpass in Vilnius at the intersection of the Southern Bypass with an access railway.
  • 1980 — 1989
Автоблокировка на участке Швенченеляй — Дукштас
In the 1980s, Lengiprotrans prepared a project for automatic blocking on the Švencheneliai - Dukshtas section of the Lithuanian railway.
  • 1980 — 1989
  • 1990 — 1999
Реконструкция автодорожного моста через подводящий канал на автодороге к Эстонской ГРЭС
In the 1980s, Lengiprotrans engineers worked on a project to reconstruct a road bridge across the supply canal on the road to the Estonian State District Power Plant. This project was carried out...
  • 1980 — 1989
Электрификация участка Кокчетав – Новоишимская
Kokchetav (Kokshetau) - Novoishimskaya - a section of the former Tselinnaya railway. The site was electrified using a 2x25 kV AC system under the Lengiprotrans project in the 1980s.
Pages