The bridge crossing over the Vilyui river was designed on the Yakutsk - Vilyuisk - Mirny highway in the Republic of Sakha (Yakutia). The length of the structure is 117 m.
Photo: Road...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The bridge over the Akra River was designed on the Eldikan - Yugorenok highway in the Republic of Sakha (Yakutia). The length of the structure is 138 m.
Photo: Highway "Amga" in alas...
The bridge crossing over the Botuobiya river was designed on the Yakutsk - Vilyuisk - Mirny highway in the Republic of Sakha (Yakutia). The length of the structure is 352 m.
In the 1990s, Lengiprotrans developed a project for the reconstruction of a bridge over the Lovat River in the town of Kholm, Novgorod Region. The length of the structure is 212 m.
In the 1990s, Lengiprotrans developed a project for the reconstruction of a bridge over the Volkhov River in the city of Veliky Novgorod. The length of the structure is 650 m.
In the 1990s, Lengiprotrans developed a project for the reconstruction of a bridge crossing on the Southern bypass of the city of Kaliningrad across the Pregolya River. The length of the structure...
Pages