The highway bridge was designed and built in the 1960s and is located on the 1198 km of the Leningrad-Murmansk highway (the current name is R-21 "Kola").
Before the construction of the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. One of such objects, the bridge crossing at the dam of the Kaunas HPP hydroelectric power...
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. The design of a road bridge across the Narva River solved the transport problems of Narva and...
In the post-war years "Lentransproekt" (since 1951 - "Lengiprotrans") developed projects for the restoration of many transport facilities in the USSR. In 1946-1947, a project was prepared for an...
In the post-war years and later, Lengiprotrans engineers worked actively on various transport facilities in the Baltics. The implementation of the project of a new capital road bridge contributed...
The highway overpass is designed at the intersection of the Vyborg - Kamennogorsk railway line with the Komsomolskoye - Priozersk highway near the Vozrozhdenie station of the Leningrad Region. The...
Pages






























