Since the 1930s, Lentransproekt (since 1951 - Lengiprotrans) has been developing methods for strengthening and treating the roadbed on railway lines. Significant work was carried out to strengthen...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Overyatskiy Plant of Reinforced Concrete Structures is an enterprise specializing in the production of reinforced concrete structures (RC) for industrial and civil construction. It was built in...
On September 20, 1954, the Council of Ministers of the USSR adopted Resolution No. 1985 “On the construction of narrow-gauge railway lines in the areas of virgin and fallow lands development”. The...
In 1954, a large-scale development of virgin and fallow lands began in the Kazakh SSR and a number of adjacent regions. The Council of Ministers of the USSR adopted a Resolution on the...
The Irtyshskoe - Karasuk railway line is the eastern section of the Central Siberian Railway. It was built according to the Lengiprotrans project in the late 1950s.
At the same time, a railway...
On September 20, 1954, the Council of Ministers of the USSR adopted Resolution No. 1985 "On the construction of narrow-gauge railway lines in the areas of virgin and fallow lands development" in...
Pages