Ivangorod-Narvsky is a border station of the Oktyabrskaya Railway (OZhD) in the Kingisepp District of the Leningrad Region.
After the collapse of the USSR, the railways were disconnected at the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Pytalovo interstate station belongs to the October railway, located in the Pskov region on the border with Latvia.
As a result of the collapse of the USSR, the railways were disconnected at...
Interstate station Pechory-Pskovskie belongs to the Oktyabrskaya railway (OZhD), located in the Pskov region on the border with Estonia.
In 1993, on behalf of the Ministry of Railways of the...
In 1993, on behalf of the Ministry of Railways of the Russian Federation (Ministry of Railways of the Russian Federation), Lengiprotrans developed a project for the reconstruction of a number of...
The Kaliningrad River Port is located on the Pregolya River and consists of 3 cargo areas:
• Pregol region, serving for cargo transshipment;
• Svetlovsky district, consisting of cargo and...
In 1992-1994, Lengiprotrans, on the instructions of JSC Neftegaz, developed a feasibility study (FS) and working documentation for an access railway track to the export base of liquefied petroleum...
Pages