For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Tartus and Latakia with the eastern regions of the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, Lengiprotrans developed a project for the Obskaya — Bovanenkovo line, the northernmost railway in the world. The route starts from the Obskaya station, which is part of the...
The Ülemiste - Maardu railway line is a connecting section of the Ülemiste - Muuga railway in Estonia.
In the 1980s, Lengiprotrans was engaged in the reconstruction of the site to create...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect seaports with the eastern regions of the country for the export of...
The Vyritsa — Orsha railway line is a section that is part of the Oktyabrskaya and Belorusskaya railways.
The project of the second tracks on the line was prepared by Lengiprotrans in the 1980s...
Railway section Ekibastuz II - Stopping point 116 km is part of the Ekibastuz railway junction. He was engaged in design work on the reconstruction and development of the Lengiprotrans unit for a...
Pages