The Tuapse - Adler railway line is part of the North Caucasus Railway. This is a narrow strip, bounded on the left by the Caucasus Mountains and on the right by the Black Sea. The key problem on...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Budogoshch - Tikhvin railway line is a section of the Tikhvin - Weimarn line of the Oktyabrskaya railway, passing through the territory of the Leningrad region.
The project of the railway...
The Pskov railway junction is a large junction of the October railway.
In 1940 Lentransproekt (since 1951 - Lengiprotrans) developed the general scheme of the Pskov junction to increase...
Railway line Kizel - Chusovskaya - a section of the Sverdlovsk railway. It was electrified in 1933 with the aim of transporting coal from the Kizelovsky coal basin to the industrial enterprises of...
The Velikie Luki Steam Locomotive Car Repair Plant (PVRZ) is an enterprise for the repair of various freight cars for the needs of railway transport. Its history begins with the arrival of the...
In December 1939, in connection with the outbreak of the Soviet-Finnish war, the Government of the USSR issued a task for the accelerated construction of the Petrozavodsk-Suoyarvi railway to...
Pages
































