Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
Вторые пути на участке Бологое — Рига
The Bologoye - Riga railway line is the main direction of the meridional route associated with the delivery of goods to the seaport of the city of Riga. In the period 1951-1955, Lengiprotrans...
  • 1950 — 1959
Реконструкция вокзала в Саратове
In 1960-1970, Lengiprotrans developed a project for the reconstruction of the railway station in the city of Saratov, built in 1871. According to the project, it was planned to cut off a part...
  • 1950 — 1959
  • 1960 — 1969
Промывочно-пропарочная станция Промышленная
In 1950-1980, Lengiprotrans developed a project for a washing and steaming station Promyshlennaya in the Kemerovo region. This complex was intended for steaming and washing railway tanks and...
  • 1950 — 1959
  • 1960 — 1969
Железнодорожная линия Суккозеро — Юшкозеро
Since the 1950s, Lengiprotrans has been developing a project for the West Karelian line, now part of the Oktyabrskaya railway. The transport development of the Karelian Autonomous Soviet Socialist...
  • 1950 — 1959
  • 1960 — 1969
Электровозное депо на станции Атбасар
Atbasar is a railway station on the Tobol - Astana line in the Akmola region of Kazakhstan. In the period 1950-1970s, the Department of Plants (now part of the OPGS) of Lengiprotrans designed...
  • 1950 — 1959
  • 1960 — 1969
Калининградское рефрижераторное вагонное депо
The Kaliningrad refrigerated wagon depot is intended for servicing insulated trains with mechanical cooling. The depot project was developed by the Lengiprotrans Plants Department in 1950-1980.
Pages