Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
Путепровод на пересечении Южного объезда с подъездным железнодорожным путем
In the 1980s, Lengiprotrans developed a project for an overpass in Vilnius at the intersection of the Southern Bypass with an access railway.
  • 1980 — 1989
  • 1990 — 1999
Парк приема на станции Даугавпилс-Сортировочная
Daugavpils-Sortirovochnaya is a junction railway station located in the city of Daugavpils in Latvia. In the 1980s, Lengiprotrans developed a project for electrical interlocking (EC) of the...
  • 1980 — 1989
  • 1990 — 1999
ЭЦ на станции Ницгале
Nitsgale is a railway station on the Krustpils - Daugavpils line in the Daugavpils region of Latvia. In the 1980s, Lengiprotrans developed a project for electrical interlocking (EC) for a 31-...
  • 1980 — 1989
Электрификация участка Кокчетав – Новоишимская
Kokchetav (Kokshetau) - Novoishimskaya - a section of the former Tselinnaya railway. The site was electrified using a 2x25 kV AC system under the Lengiprotrans project in the 1980s.
  • 1980 — 1989
  • 1990 — 1999
Электрификация участка Беломорск — Сумский Посад
Railway line Belomorsk - Sumskiy Posad - section of the Oktyabrskaya railway. The line runs along the coast of the Onega Bay in the north-east of the Republic of Karelia. The line was...
  • 1980 — 1989
  • 1990 — 1999
Реконструкция моста через реку Нарву
The reconstruction of the bridge over the Narva River in the Estonian city of Narva was carried out according to the Lengiprotrans project. Design and survey work began in 1985 when...