The Vyritsa — Orsha railway line is a section that is part of the Oktyabrskaya and Belorusskaya railways.
The project of the second tracks on the line was prepared by Lengiprotrans in the 1980s...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Railway section Ekibastuz II - Stopping point 116 km is part of the Ekibastuz railway junction. He was engaged in design work on the reconstruction and development of the Lengiprotrans unit for a...
The railway section Tselinograd (now Astana) - Kokchetav (now Kokshetau) is a meridional line connecting the South Siberian and Central Siberian railways in Kazakhstan.
The Tselinograd -...
Railway line Delyatyn - Rakhov - state border - section of the Lvov railway.
The project of strengthening retaining walls, subgrade and structures on the section Delyatin - Rakhov - state...
The Kokchetav (Kokshetau) - Kzyl-Tu railway line is a section of the Kazakhstan railway. The project of the second tracks on the site was developed by Lengiprotrans by decree of the Central...
In the 1970s – 1980s, Lengiprotrans developed a project for second tracks with electrification on the Kokchetav (now Kokshetau) - Tselinnye Sands - Presnogorkovskaya section by decree of the CPSU...
Pages






























