TCh-3 "Moskovskoye" is located on the Moscow-Petrogradskaya line of the Petersburg metro, behind the station "Kupchino". In addition to Moskovsko-Petrogradskaya, the depot also serves the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Lengiprotrans has been involved in the reconstruction and development of the Kaliningrad railway junction for decades, starting from the post-war period.
In 1951, the institute designed the...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for the restoration of the central boiler house at the Kaliningrad station.
Later, in 1970-1979, the...
In the 1970s, the Department of Hubs and Stations of Lengiprotrans developed a significant number of copyright objects for the development of railway junctions and marshalling yards. Among them, a...
The Ulyanka passenger stop is located on the 12th km of the Baltic line of the Oktyabrskaya railway. The directions St. Petersburg - Kalische and St. Petersburg - Gatchina-Baltiyskaya pass through...
Rybatskoye - Kupchinskaya is a section of the Southern Semicircle (also called the Second Port Branch) of the St. Petersburg railway junction, opened in 1930.
In the 1970s-1980s, according to...
Pages

































