In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. The design of a road bridge across the Narva River solved the transport problems of Narva and...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The railway line Leningrad - Zelenogorsk - Roshchino - Vyborg is the main section of the Vyborg direction of the Oktyabrskaya railway.
In the 1950s – 1960s, Lengiprotrans participated in the...
The Vyborg railway station is located in the Leningrad Region and is part of the Oktyabrskaya Railway. The station building, built in 1913, was destroyed during the Great Patriotic War. In the...
In 1950-1960s Lengiprotrans developed a project for the reconstruction of a railway station in Riga. This was the first renovation of the building since its construction at the end of the 19th...
The Bologoye - Riga railway line is the main direction of the meridional route associated with the delivery of goods to the seaport of the city of Riga.
In the period 1951-1955, Lengiprotrans...
Konosha railway junction is a large railway junction on the Northern Railway.
In the first half of the 1950s, Lengiprotrans specialists developed a project for the development of the Konosha...
Pages