Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
Автоблокировка на участке Швенченеляй — Дукштас
In the 1980s, Lengiprotrans prepared a project for automatic blocking on the Švencheneliai - Dukshtas section of the Lithuanian railway.
  • 1980 — 1989
Автодорожный путепровод через железнодорожный участок Псков — Пыталово
In the 1980s, Lengiprotrans developed a project for a road overpass on the 366th km of the Pskov - Pytalovo railway section of the Oktyabrskaya railway.
  • 1980 — 1989
Комплексы дорожного сервиса в Московской области
In the 1980s, the Architectural and Construction Department (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans designed a large number of multi-profile...
  • 1980 — 1989
Автодорожные мосты через реку Нюкжа
In the 1980s, Lengiprotrans developed projects for 3 bridge crossings over the Nyukzha River on the highway along the Baikal-Amur Mainline: • at 286 km of the road; • at 307 km in the area of ​​...
  • 1980 — 1989
Комплексы дорожного сервиса в Тульской области
In the 1980s, the Architectural and Construction Department (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans designed a large number of multi-profile...
  • 1980 — 1989
Пешеходный мост на станции Струги Красные
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Strugi Krasnye Oktyabrskaya railway station.
Pages