For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Tartus and Latakia with the eastern regions of the...
International projects
International projects
Over more than 80 years, some 400 projects in 16 countries have been built and reconstructed after the designs developed by Lengiprotrans: railway lines, hubs and stations, power lines, production facilities, railway terminals, bridges and viaducts.
The project geography is vast: Russia, the Baltic States, the Middle East, and CIS.
In 1970–1980, Lengiprotrans had its permanent representation office in the Republic of Cuba.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1970-1980, Lengiprotrans participated in the design of the Ekibastuz industrial area in the Kazakh SSR. This included the Ekibastuz GRES, the Vostochny and Bogatyrsky open-pit coal mines, and...
Tselinograd - Kokchetav (now Astana - Kokshetau) is a meridional line connecting the South Siberian and Central Siberian lines in Kazakhstan.
In the 1970s, Lengiprotrans developed a project for...
In the 1960s-1970s, Lengiprotrans developed a project for remote control of the fencing of trains at the Shkirotava station in Latvia.
Also at the station, the institute designed:
• adaptation...
In 1970-1980, Lengiprotrans carried out design and survey work for the construction of a new marshalling yard in the Vilnius railway junction. Engineering and geological materials were prepared...
In 1960-1980, Lengiprotrans designed a wastewater treatment plant for a locomotive depot at Tallinn-Kopli station in Estonia.
The facility has developed: cross-sections, construction part,...
Pages