Bata - Karabas is a section of the Kazakhstan railway.
In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 5 railway line stations with 21 turnouts...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Tobol - Dzhetygara is a section of the Kostanay - Dzhetygara railway line of the Kazakhstan railway. The line was designed by Lengiprotrans in the 1950s to transport iron ores from the Sokolovo-...
Riga-Passenger is the main railway station in the capital of Latvia.
In the 1980s, Lengiprotrans developed a project for the modernization of electrical interlocking devices (EC) for 130...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. In the 1980s, the institute developed a project for the Tartus-Latakia line for operational...
Tallinn is a passenger railway station in the capital of Estonia. The directions Narva - Tallinn, Tallinn - Viljandi pass through it.
In the 1980s, Lengiprotrans developed a project to...
In 1970-1980, Lengiprotrans developed a project for mechanization of the hump with the modernization of hump automation and electrical centralization at the Radviliskis station of the Lithuanian...
Pages