The Pääsküla-Keila railway line is a section of the Tallinn-Keila railway in Estonia.
In November 1945, the Department of Electrification and Power Supply was formed at Lentransproekt (since...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Tallinn - Pääsküla railway line is a section of the Tallinn - Keila railway in Estonia.
In November 1945, the Department of Electrification and Power Supply was formed at Lentransproekt (...
The Novosibirsk - Chulymskaya railway line is a section of the West Siberian railway.
In 1940-1950s Lengiprotrans developed a project for the electrification of the line. An automatic blocking...
Railway line Perm - Balezino - section of the Kirov - Perm line of the Gorkovskaya railway.
The line was electrified according to the Lengiprotrans project in 1951-1959. On the tracks, a coded...
Railway line Kizel - Chusovskaya - a section of the Sverdlovsk railway. It was electrified in 1933 with the aim of transporting coal from the Kizelovsky coal basin to the industrial enterprises of...
The Dno is the junction station of the October railway. The directions St. Petersburg - Vitebsk and Rybinsk - Bologoye - Pechory-Pskovskie pass through it.
In 1940-1950, a power plant was built...
Pages