During the development of virgin lands Lengiprotrans designed 5 new large state farms in the Pavlodar region of the Kazakh SSR. Including the project of the state farm named after Satpayev was...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1960s, Lengiprotrans participated in the design of buildings and structures on the Latakia - Oronte and Kamyshli - Aleppo - Oronte railways under construction in the Syrian Arab Republic....
Tolmachevsky Plant of Reinforced Concrete Structures (now Tolmachevsky Plant of Reinforced Concrete and Metal Structures) is a city-forming enterprise specializing in the production of reinforced...
In 1950-1970s one of the main directions of the Department of Plants (now as part of the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans was the design of...
In 1950-1970s Lengiprotrans developed a project for the reconstruction of the Daugavpils plant of prefabricated reinforced concrete structures of the "Balttransstroy" trust.
In 1980-1987,...
In the 1950s – 1960s, Lengiprotrans designed new railway lines for the development of virgin lands in Kazakhstan. The capital of the republic Akmolinsk (now Astana) became the center of railway...
Pages