The railway station in Konigsberg (now Kaliningrad) was conceived at the end of the 19th century. This was implemented in the 1920s.
Throughout almost the entire Second World War, the station...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the post-war years, the Lentransproekt architectural studio (since 1951 - Lengiprotrans) developed a project for the restoration of the railway station at Abrene station (now Pytalovo station...
Sonda station is located on the Tapa - Narva line of the Estonian Railways.
During the Second World War, the station at the station was destroyed. In the postwar years, Lentransproekt (since...
The train station at Tallinn-Sadam station was destroyed during the Second World War. In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for the restoration of...
The Pskov station is part of the Oktyabrskaya Railway (OZhD), and, first built in 1859, it originally belonged to the Petersburg-Warsaw Mainline (sections of this mainline became part of the...
Valga station is located on the Tartu-Valga railway line in the south of Estonia. It is a border crossing, through which the transition from Estonia to Latvia is carried out.
During the Second...
Pages






























