In 1960-1970, Lengiprotrans developed a general scheme for a complex of strengthening measures to protect the roadbed of railways and highways on the Circum-Baikal section of the East Siberian...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Astrakhan railway station is part of the Volga railway. The station building was built at the beginning of the 20th century. In the 1960s, in order to service the increased passenger traffic,...
The Astrakhan railway station is part of the Volga railway. It was opened in 1909. Long-distance and suburban trains run through the station.
In the 1960s Lengiprotrans was developing the...
In the 1960s Lengiprotrans developed a project for the development of the Radviliskis station of the Baltic railway.
The object was designed:
• track section and subgrade;
• water supply and...
Kaliningrad is a railway station of the Kaliningrad railway, serving passenger trains of short and long distance.
In the period 1963-1983, Lengiprotrans carried out design work for the...
Tselinograd (now Astana) - Tobol is a section of the latitudinal South Siberian railway, passing through the territory of Kazakhstan.
The site was designed by Lentransproekt (since 1951 -...
Pages