Караганда-Новая (ныне Жана Караганды) — станция в Карагандинской области Казахстана.
В ходе развития железнодорожной сети Казахской ССР «Ленгипротранс» разработал проект электрической...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
For a long time Lengiprotrans has been developing and improving the railway network in Lithuania. In the period 1946-1955, the institute designed route control devices at 15 stations of the...
Virbalis - Kaliningrad is a railway section passing through the territory of Lithuania and Russia.
In the period 1946-1955, Lengiprotrans developed a semi-automatic blocking on the site. This...
In the post-war years "Lentransproekt" (since 1951 - "Lengiprotrans") developed projects for the restoration of many transport facilities in the USSR. In 1946-1947, a project was prepared for an...
Bystrovka - Rybachye - the railway section of the Lugovaya - Rybachye line, passing through the territory of Kyrgyzstan.
The railway was designed by Lentransproekt (since 1951 - Lengiprotrans)...
In the 1940s, in the course of the development of the railway network of the Kazakh SSR, Lentransproekt (since 1951 - Lengiprotrans) developed a project for a precast concrete plant (RC) in...
Pages