Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Вокзал в Сыктывкаре
In the period 1940-1960s, the specialists of Lengiprotrans designed the Mikun-Syktyvkar railway line, which connected the Syktyvkar terminal station with the Northern Railway. To serve passengers...
  • 1950 — 1959
Вокзал в Риге
In 1950-1960s Lengiprotrans developed a project for the reconstruction of a railway station in Riga. This was the first renovation of the building since its construction at the end of the 19th...
  • 1950 — 1959
Вокзал Выборг
The Vyborg railway station is located in the Leningrad Region and is part of the Oktyabrskaya Railway. The station building, built in 1913, was destroyed during the Great Patriotic War. In the...
  • 1950 — 1959
Вокзал Гатчина-Балтийская
Baltiysky railway station in Gatchina is located at the station of the Gatchina-Passenger-Baltic Oktyabrskaya railway. Railway traffic from St. Petersburg to Gatchina was opened in 1872, and...
  • 1950 — 1959
Реконструкция вокзала в Саратове
In 1960-1970, Lengiprotrans developed a project for the reconstruction of the railway station in the city of Saratov, built in 1871. According to the project, it was planned to cut off a part...
  • 1950 — 1959
Вокзал Мурманск
The railway station of the station Murmansk is an important part of the October railway. The building itself was erected in the 50s of the last century on the site where the station that used to...
Pages