Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
  • 1980 — 1989
Перевод на телеуправление электрифицированного участка Рига — Тукумс
The Riga - Tukums railway line is a section of the Tornakalns - Tukums II electrified line in Latvia. In the period 1976–1980, Lengiprotrans developed a project for transferring the Riga -...
  • 1970 — 1979
  • 1980 — 1989
Устройства СЦБ и связи на перегоне Пярну-Грузовая — Пярну-Пассажирская
In 1976-1980, Lengiprotrans developed a project for laying cable communication lines on the Pärnu Gruzovaya - Pärnu-Passenger section in Estonia.
  • 1970 — 1979
  • 1980 — 1989
База ремонта вагонов метрополитена в г.Киеве
In the 1970s, Lengiprotrans engineers designed a base for the repair of metro cars in Kiev. The facility was created with the aim of organizing all types of metro car repairs in order to return...
  • 1970 — 1979
Электрическая централизация на станции Лийва
In the 1970s, Lengiprotrans prepared a project for electrical interlocking at Liiva station for 30 switches. A compressor station and a transformer substation were designed at the station.
  • 1970 — 1979
Путепроводная развязка в железнодорожном парке ст. Вентспилс
During the Soviet period, Lengiprotrans took an active part in the transport development of railway approaches and stations at the seaports in the Baltic States. For the development of the...
  • 1970 — 1979
  • 1980 — 1989
Тяговая подстанция на станции Скривери
In the 1970s, Lengiprotrans developed a traction substation project at Skriveri station in Latvia. Longitudinal and transverse profiles were prepared, external power supply of the facility was...
Pages